
Kitchen countertops
Countertops in St. George: quartz, granite and more
Shopping for new countertops in St. George or Cedar City? Compare quartz countertops and granite countertops on cost, see what other homeowners pick, and learn how the install fits your schedule. One licensed remodeler can price it for free.
- Quartz and granite costs side by side
- How long the install takes, start to finish
- A free written estimate from one licensed remodeler
Free referral service · Your request goes to one licensed Utah remodeler · How it works
Get a free estimate
Three quick questions. One licensed local remodeler calls you back. No obligation.
- Licensed remodelers onlyactive Utah contractor license
- One remodeler per requestyour details aren't sent to a list
- Free in home consultationand a written estimate
- Free to youremodelers pay us, you don't
Quartz leads, granite comes second
Engineered quartz is the most chosen countertop in the U.S., picked by 32% of renovating homeowners in Houzz's 2026 study, though that's down 7 points from the year before. Granite came next at 15% and quartzite at 10%1.
Those are national numbers; no survey tracks St. George on its own. The Cost vs Value report's cost recipes show the same divide by budget: its midrange major kitchen assumes laminate tops2, while its upscale kitchen assumes stone counters3.
Quartz countertops in St. George: what they cost
Most quartz countertop projects run about $2,600 to $4,400, with a national average near $3,500. Installed prices range from about $50 to more than $200 per square foot, and installation labor alone is about $10 to $35 per square foot4.
Your total depends on how many square feet you need, the edge style, and the cutouts for a sink or cooktop. A big island adds up fast, so measure it before you fall for a pricey slab.
Granite countertops: what they cost
A typical granite countertop job costs $2,500 to $5,000. Fixr's national average is $3,500 for about 30 square feet with a simple eased edge and no backsplash. The slab itself runs about $40 to $200 per square foot, and installation averages about $30 per square foot5.
| Cost | Quartz | Granite |
|---|---|---|
| Typical project | $2,600 to $4,400 | $2,500 to $5,000 |
| National average | About $3,500 | About $3,500 |
| Per square foot | $50 to $200+ installed | $40 to $200 for the slab |
| Installation labor | $10 to $35 per sq ft | About $30 per sq ft |
On price, the two are close to a tie. So let the look decide, and see full slabs in person before you choose.
How much of the kitchen budget goes to countertops
Countertops take roughly 10% to 14% of a kitchen remodel budget. A National Kitchen and Bath Association breakdown puts them at 10%6, and Fixr's 2026 split puts them at 14%7.
New counters can stand alone, but they often come with other updates. In a builder grade kitchen, a refresh might pair new tops with painted or refaced cabinets, a backsplash and a new sink. Bigger plans belong in a full kitchen remodel, and the kitchen remodel cost guide shows how the pieces add up.
Backsplash, sink and faucet
Most people choose tile for the backsplash: 72% did in Houzz's 2026 study1. Fixr puts a tile backsplash at $500 to $1,500, or about $25 per square foot installed8.
New counters are also a good time to change the sink and faucet. St. George's water report says most Southern Utah water is hard and suggests softener settings of 13 to 24 grains per gallon9, and hard water leaves scale in pipes and water heaters10. Ask whether the kitchen line runs through your softener.
Leave room to work, too. NKBA guidelines call for at least 24 inches of counter on one side of the sink and 18 inches on the other, plus 12 and 15 inches on either side of a cooktop11.
How long a countertop install takes
Counters come near the end. They can't be measured until the base cabinets are set, and Fixr says they add about 2 days to a week after that12. The usual order:
- The base cabinets go in and get leveled.
- The fabricator makes a pattern of the cabinet tops.
- The slab is cut, with openings for the sink and cooktop.
- Installers set the tops, then a plumber connects the sink and faucet.
Permits and licenses for countertop work
Replacing countertops in place usually doesn't need a building permit. Utah's statewide residential code lists counter tops, cabinets, tile and painting as exempt finish work13. Moving the sink or adding outlets is different, so the remodeler should confirm with your city's building office.
In Utah, the S230 specialty license covers stone, granite, marble and tile, and S220 covers countertops and cabinets14. Even on small jobs, plumbing work goes to a licensed plumbing contractor, and jobs of $7,000 or more generally need a licensed contractor15. Check any license on DOPL's free lookup16. Local permit notes are on the St. George page.

Service area
Countertops across Southern Utah
Countertop requests come from St. George, the rest of Washington County and Cedar City. Each goes to one licensed remodeler who works in that area.
How the referral works
Four steps from your first tap to a written estimate
You talk with one remodeler, not a crowd. Here's exactly what happens after you reach out.
Tell us about your project
Pick the room, roughly when you'd like to start and a budget range, then add your name, phone and ZIP code. Prefer to talk it over? Call (385) 450-4329.
We confirm a license and pass it on
We look up the remodeler who covers your ZIP code on Utah's DOPL license lookup to make sure the contractor license is active. Then your request goes to that one independent remodeler and nobody else.
The remodeler sets up a visit
The remodeler contacts you to talk through the job and book a free in home consultation. At the visit they see the space, take measurements and hear what you have in mind.
You get a written estimate and choose
The written estimate costs you nothing, and you don't have to hire anyone. If you go ahead, the contract, permits and payments are between you and the remodeler, never Southern Utah Kitchen Remodel.
Countertops FAQ
Questions about countertops
How much do quartz countertops cost in St. George?
Fixr's 2026 national figures put most quartz countertop projects at $2,600 to $4,400, with an average near $3,500. Installed prices run about $50 to more than $200 per square foot4.
No study publishes St. George prices, so use those as a starting point. Your total depends on square footage, the slab, the edge and the cutouts. A remodeler can measure and price it at a free visit.
Quartz or granite for a St. George kitchen?
On cost, it's close to a tie. Fixr's typical ranges are $2,600 to $4,400 for quartz4 and $2,500 to $5,000 for granite5. Quartz is more popular, chosen by 32% of renovating homeowners in Houzz's 2026 study versus 15% for granite1.
It helps to compare real slabs side by side, in the light of your own kitchen if you can.
Can new countertops go on my old cabinets?
Often, yes, if the cabinets are solid, level and in the layout you want. Ask the remodeler to check the boxes before ordering a heavy slab. The Cost vs Value report's midrange minor kitchen remodel does exactly this: it keeps the cabinet boxes and replaces the counters17. You can also paint the cabinets at the same time, which Fixr prices at $2,500 to $6,500 for most kitchens18.
Is a permit required for new countertops in Utah?
Usually not. Utah's statewide residential code lists counter tops as finish work that's exempt from a building permit13. If the sink moves, outlets are added or a wall changes, a permit is likely needed, and Cedar City says a house remodel needs one19. The remodeler should confirm with your city before work starts.
How long does countertop installation take?
Fixr says new counters add about 2 days to a week after the cabinets are set12. The fabricator needs the cabinets in place to make a pattern, then cuts the slab to fit. Plan to be without a working kitchen sink for part of that time, and ask the remodeler for the dates in writing.
Sources
- 2026 U.S. Houzz Kitchen Trends Study, Houzz, checked Nov 2026
- Major Kitchen Remodel, Midrange, Journal of Light Construction, checked Nov 2026
- Major Kitchen Remodel, Upscale, Journal of Light Construction, checked Nov 2026
- How Much Are Quartz Countertops? (2026 Data), Fixr, checked Nov 2026
- Granite Countertops Cost, Fixr, checked Nov 2026
- Budget Breakdown for Your Kitchen Remodel (National Kitchen and Bath Association figures), Florida Realtors, checked Nov 2026
- How Much Does a Kitchen Remodel Cost? (2026 Data), Fixr, checked Nov 2026
- How Much Does It Cost to Install a Backsplash? (2025 Guide), Fixr, checked Nov 2026
- 2024 Drinking Water Quality Report, City of St. George, checked Nov 2026
- Hardness of Water, USGS Water Science School, checked Nov 2026
- Kitchen Planning Guidelines with Access Standards, National Kitchen and Bath Association, checked Nov 2026
- How Long Does a Kitchen Remodel Take?, Fixr, checked Nov 2026
- 2021 International Residential Code as adopted in Utah, Section R105.2, UpCodes, checked Nov 2026
- Contractor License Classifications and Scope of Practice, Utah Administrative Code (Cornell LII copy), checked Nov 2026
- Exemptions from Licensure, Utah Construction Trades Licensing Act, Utah Legislature, checked Nov 2026
- Licensee Lookup and Verification System, Utah Division of Professional Licensing, checked Nov 2026
- Minor Kitchen Remodel, Midrange, Journal of Light Construction, checked Nov 2026
- How Much Does It Cost to Paint Kitchen Cabinets in 2026?, Fixr, checked Nov 2026
- Building and Zoning FAQs, Cedar City, checked Nov 2026
Ready to price new countertops?
Send a few details or call (385) 450-4329. We'll pass your request to one licensed remodeler near you for a free written estimate.